Meet us at Piscine Global · Lyon · 18 November 2026 Book a meeting →
Projects

Built by HESP.

Selected pools and SPA zones from the last two years — health resorts, hotels, municipal facilities and private clients. Every project has a full photo report on our Polish site.

Perła Bałtyku — full renovation of a brine pool01
Health resort · Kołobrzeg · January 2026

Perła Bałtyku — full renovation of a brine pool

  • Client: Uzdrowisko Kołobrzeg S.A.
  • Indoor overflow pool with brine
  • 48 h to bare concrete · water on day 30 · handover on day 33
  • Full SCHÖNOX system, chemical-resistant grouts, 10-year leak-tightness warranty
Full photo report (in Polish)
SOFRA Health Institute — renovation in an operating hotel02
Hotel & SPA · Karpacz

SOFRA Health Institute — renovation in an operating hotel

  • Hotel and SPA open throughout the works
  • Broken out and ground down to the structure; floor deepened in an arc
  • All pipe penetrations replaced and resealed
  • Agrob Buchtal pool ceramics, XR40 chemical-resistant grout
Full photo report (in Polish)
HESP Overflow XL — from design to commissioning03
Private · flagship · Poland · July 2026

HESP Overflow XL — from design to commissioning

  • Architectural, structural and pool-technology design by HESP (arch. Jakub Smolarkiewicz)
  • Polypropylene balance tank welded on site
  • Hayward salt electrolysis, continuous free-chlorine measurement, smartphone control
  • Custom Ezarri blend — 8% white tiles placed by hand
Full photo report (in Polish)
Milenium — pool deck and a new steam room04
Municipal pool · Kołobrzeg · April–August 2026

Milenium — pool deck and a new steam room

  • 450 m² of deck reprofiled to laser level
  • Bonded sealing, R11/B anti-slip porcelain, glass mosaic on the islands
  • Steam room built from scratch, large formats
  • Pego steam generator
Full photo report (in Polish)
AQUA TOUR — two Finnish saunas and a steam room05
SPA zone · Szczecinek · 2026

AQUA TOUR — two Finnish saunas and a steam room

  • 30-seat sauna, 2 × 18 kW EOS heaters, 95 °C in 30 minutes
  • Second sauna for four, steam room with a Pego generator
  • Large-format SPA floors sealed like a pool basin
  • All layers in the SCHÖNOX system
Full photo report (in Polish)
Nickel Resort SPA — overflow basin finishing06
Hotel · Grzybowo near Kołobrzeg · October 2025

Nickel Resort SPA — overflow basin finishing

  • Reinforced-concrete overflow basin taken over in shell condition
  • Pool deck with a linear drainage system
  • Every layer, primer to grout, in the SCHÖNOX system
Full photo report (in Polish)
Hotel Verde — arches, rounded corners, logo in mosaic07
Five-star hotel · Koszalin · March 2025

Hotel Verde — arches, rounded corners, logo in mosaic

  • Overflow basin with arches, rounded corners and inner stairs
  • Hotel logo reproduced in mosaic on the basin floor
  • Full deck: screeds to falls, sealing, linear drainage, stone cladding
Full photo report (in Polish)
Sunday Resort — overflow basin in glass mosaic08
Hotel · Ustronie Morskie · July 2025

Sunday Resort — overflow basin in glass mosaic

  • Full finishing scope: substrate, penetrations, reprofiling, bonded sealing
  • Glass mosaic over the entire basin
  • SCHÖNOX system in every layer
Full photo report (in Polish)
Dojo — an outdoor pool in golden proportions09
Private · Stara Wieś · August 2025

Dojo — an outdoor pool in golden proportions

  • Concept, design, construction, commissioning, staff training — 100% HESP
  • Two circles in the golden ratio, 49 m² of water surface
  • Concrete C30/37 W8, Ezarri glass mosaic
  • Hayward salt electrolysis, hidden underground plant room
Full photo report (in Polish)

Want your product in projects like these?

Partnership for manufacturers